Designing ventilation systems of theatres or concert halls can be extremely challenging due to the need to evacuate the heat produced by the large number of people and the high performance lighting elements while maintaining low noise and low air velocities.
In this project, the air flow in the concert hall of the future National Philharmonics was simulated in order to determine the optimal placing of intake and exhaust nozzles.

Work included:

|
Office and post address: |